Success Cases · Global Customers

Zhuku Global Warehouse Automation Projects

500+ warehouse automation projects have been implemented in 75+countries, covering core industries such as manufacturing, cold storage, e-commerce, pharmaceuticals, and retail. Behind every number is a truly quantifiable value.

500+
Completed Projects
110+
Coverage Countries
99.5%
Customer Satisfaction

Proven Warehouse Automation Success

Shijiazhuang Automated Stacker Crane Warehouse Project - img Logistics

Shijiazhuang Automated Stacker Crane Warehouse Project

Zhuku completed a fully automated stacker crane warehouse project in Shijiazhuang with 9 stacker cranes, conveyor syst...

9,089㎡
Warehouse Area
23,580
Pallet Positions
3PL
Industry
South Africa Stacker Crane Automated Warehouse Project - img Manufacturing

South Africa Stacker Crane Automated Warehouse Project

Zhuku delivered a compact AS/RS solution in South Africa featuring a single-aisle stacker crane, conveyors, and wareho...

100%
Warehouse Density Increased
500
Pallet Positions
ASRS
System
Thailand Automotive Seat Manufacturer Stacker Crane Automated Warehouse Project - img Automotive Manufacturing

Thailand Automotive Seat Manufacturer Stacker Crane Automated Warehouse Project

Zhuku delivered an automated stacker crane warehouse solution for a Thailand automotive seat manufacturer, integrating...

3
Stacker cranes
6
Vertical lifts
100%
Automated Transportation

Measurable Success from 500+ Global Projects

Real world data comes from over 500 delivered projects, covering three core dimensions: warehouse density, operational efficiency, and cost savings

110%
Average increase in storage density
High density storage technology (shuttle bus+three-dimensional shelves) can store more goods underground, completely solving the bottleneck of storage space.
Traditional warehouseHEGERLS plan
110%
Average improvement in homework efficiency
Automated picking and placing+WCS intelligent scheduling, peak processing capacity is 4-5 times that of manual warehouses, and large-scale promotions are no longer a bottleneck.
manual workautomated operation
90%
Average savings in operating costs
The comprehensive savings in manpower, error losses, and space rental have an average investment payback period of 20-26 months, with significant long-term ROI.
Traditional OperationsAutomated Operations
99.98%
Picking accuracy
22Month
Average investment payback period
99.5%
Equipment availability rate
1+Year
Whole machine warranty commitment

Trusted by Customers in 110+ Countries

Real feedback from over 500 customers drives our continuous improvement in warehouse automation, system integration, and service quality.

E-commerce/China
"

The four-way shuttle system of Zhuku enabled us to achieve an average daily processing capacity of 50000 orders during the Double Eleven period, which previously required three times the manpower to barely achieve. The system runs stably with zero downtime in the past 14 months, exceeding our expectations.

Storage efficiency increased by 420%, labor costs saved by 65%, and investment recovered in 18 months
Pharmaceuticals/ Germany
"

We evaluated five AS/RS vendors globally. Zhuku not only offered the most competitive total cost of ownership, but their engineering team demonstrated the deepest understanding of GxP compliance requirements. The system has been running flawlessly for over two years.

Batch traceability accuracy: 100%
3PL / Thailand
"

Zhuku delivered outstanding project management and technical support from start to finish. The Bangkok automation project was completed in 4 months, 3 weeks ahead of schedule. Their fast response, professional service, and reliable after-sales support have exceeded our expectations.

3 weeks ahead of schedule delivery, 38% reduction in operating costs
Cold Chain / China
"

Our cold storage operates at -25°C, and we were initially concerned about whether the shuttle system could perform reliably under such extreme conditions. However, the Zhuku cold-storage shuttle system has been running continuously and stably for 18 months without any failures, completely eliminating our concerns

Continuous operation at -25°C for 18 months
Automobile Manufacture / Germany
"

As a German automotive Tier-1 supplier, we have extremely strict requirements for quality, precision, and reliability. Zhuku’s equipment manufacturing accuracy and system stability fully met our demanding standards. After implementation, the JIT delivery mismatch rate was reduced from 0.5% to just 0.02%, providing irreplaceable value to our production line and significantly enhancing operational reliability.

JIT delivery mismatch rate was reduced from 0.5% to just 0.02%